Статус модернизаций по пожарной безопасности на ААЭС, RT-IAEA-01/10-D3.15-001_rev01, Версия 1, Май 2011
LOCA100mm analysis (case-2: Break of HPI system header), RT-IAEA-01_10-D3.5-007, Revision 3, May 2011
LOCA100mm analysis (case1-cold leg), № RT-IAEA-01/10-D3.5-005_rev03, Revision 3, May 2011
Analysis of double ended break of pressurizer surge line accident, № RT-IAEA-01/10-D3.5-004_rev05, Revision 5, May 2011
Impact on ANPP safety of change of VI-th group lower and upper boundaries, № NRSC-RT-A111-1.3-004, Revision 1, May 2011
Assessment of hydrogen issues during pressurizer double ended surge line break accident, RT-IAEA-01/10-D3.12-002, Revision 1, May 2011
Investigation of aerosol and fission products behavior in ANPP confinement during severe accident, Task B1-B5, RT_GRS_01-09_B1-B5_001, Revision 1, April 2011
Verification and Validation of VVER-440 Reactor Fuel, Control Assembly and Reflector Cross-sections Library, NRSC-BNL-09_01-T4&5-001, Revision 01, March 2011
Sh. Poghosyan, A. Amirjanyan, Investigation on ageing impact on safety systems reliability, ANS PSA 2011 Int. topical meeting on probabilistic safety assessment and analysis, Wilmington, NC, 13-17 March 2011
Review report Comparison analysis of ANPP calculated and measured values, № NRSC-RT-Ա111-1.3-001, March 2011