{"id":481,"date":"2015-10-13T13:17:43","date_gmt":"2015-10-13T13:17:43","guid":{"rendered":"http:\/\/nrsc-am.com\/?p=481"},"modified":"2016-10-03T13:19:54","modified_gmt":"2016-10-03T13:19:54","slug":"first-criticality-for-two-chinese-reactors","status":"publish","type":"post","link":"https:\/\/nrsc-am.com\/hy\/first-criticality-for-two-chinese-reactors\/","title":{"rendered":"First criticality for two Chinese reactors"},"content":{"rendered":"<p>Two new Chinese nuclear power units &#8211; Changjiang 1 and Yangjiang 3 &#8211; have moved closer to commissioning by achieving a sustained chain reaction for the first time. Both reactors are expected to begin operating later this year.<\/p>\n<p>Unit 1 of the Changjiang nuclear power plant, under construction on China&#8217;s southern island province of Hainan, achieved first criticality at 3.39am today, China National Nuclear Corporation (CNNC) announced.<\/p>\n<p>Initial approval for the Changjiang plant&#8217;s construction was granted by China&#8217;s National Developmental and Reform Commission in July 2008. Early site works began in December 2008. Construction of unit 1 began with the pouring of first concrete on 25 April 2010, while that for unit 2 was poured on 21 November 2010.<\/p>\n<p>The loading of the 121 fuel assemblies into the core of Changjiang 1 &#8211; a 650 MWe CNP-600 pressurized water reactor &#8211; began on 26 August.<\/p>\n<p>Changjiang 1 is scheduled to begin operating by the end of 2015, with unit 2 set to start up next year.<\/p>\n<p>The plant, near Hoi Mei Tong village in China&#8217;s Hainan province, is being built as a joint venture between CNNC and China Huaneng Group, with shares split 51% and 49%, respectively. The plant will eventually comprise four units, with units 3 and 4 housing either CNP-650 or ACP-600 reactors. Construction of both those units is scheduled to begin by 2018.<\/p>\n<hr style=\"width: 80%;\" \/>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/nrsc-am.com\/wp-content\/uploads\/2016\/10\/1123_0.jpg\" alt=\"1123_0\" width=\"640\" height=\"425\" class=\"aligncenter size-full wp-image-482\" srcset=\"https:\/\/nrsc-am.com\/wp-content\/uploads\/2016\/10\/1123_0.jpg 640w, https:\/\/nrsc-am.com\/wp-content\/uploads\/2016\/10\/1123_0-300x199.jpg 300w, https:\/\/nrsc-am.com\/wp-content\/uploads\/2016\/10\/1123_0-272x182.jpg 272w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><\/p>","protected":false},"excerpt":{"rendered":"<p>Two new Chinese nuclear power units &#8211; Changjiang 1 and Yangjiang 3 &#8211; have moved closer to commissioning by achieving a sustained chain reaction for the first time. Both reactors are expected to begin operating later this year. Unit 1 of the Changjiang nuclear power plant, under construction on China&#8217;s southern island province of Hainan, achieved first criticality at 3.39am today, China National Nuclear Corporation (CNNC) announced. Initial approval for the Changjiang plant&#8217;s construction was granted by China&#8217;s National Developmental and Reform Commission in July 2008. Early site works began in December 2008. Construction of unit 1 began with the pouring of first concrete on 25 April 2010, while that for unit 2 was poured on 21 November 2010. The loading of the 121 fuel assemblies into the core of Changjiang 1 &#8211; a 650 MWe CNP-600 pressurized water reactor &#8211; began on 26 August. Changjiang 1 is scheduled to begin operating by the end of 2015, with unit 2 set to start up next year. The plant, near Hoi Mei Tong village in China&#8217;s Hainan province, is being built as a joint venture between CNNC and China Huaneng Group, with shares split 51% and 49%, respectively. The plant will eventually comprise four units, with units 3 and 4 housing either CNP-650 or ACP-600 reactors. Construction of both those units is scheduled to begin by 2018.<\/p>","protected":false},"author":1,"featured_media":482,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"nf_dc_page":"","_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[13,40],"tags":[],"class_list":["post-481","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-news-2015"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/nrsc-am.com\/hy\/wp-json\/wp\/v2\/posts\/481","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nrsc-am.com\/hy\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nrsc-am.com\/hy\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nrsc-am.com\/hy\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/nrsc-am.com\/hy\/wp-json\/wp\/v2\/comments?post=481"}],"version-history":[{"count":1,"href":"https:\/\/nrsc-am.com\/hy\/wp-json\/wp\/v2\/posts\/481\/revisions"}],"predecessor-version":[{"id":483,"href":"https:\/\/nrsc-am.com\/hy\/wp-json\/wp\/v2\/posts\/481\/revisions\/483"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nrsc-am.com\/hy\/wp-json\/wp\/v2\/media\/482"}],"wp:attachment":[{"href":"https:\/\/nrsc-am.com\/hy\/wp-json\/wp\/v2\/media?parent=481"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nrsc-am.com\/hy\/wp-json\/wp\/v2\/categories?post=481"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nrsc-am.com\/hy\/wp-json\/wp\/v2\/tags?post=481"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}